Made in China Sink Flange Drain Floor Trap with Cover Stainless Steel Water Drain Cover Bathroom Siphon Floor Drain
FOB Price: | US$0.30-26.20 / Set |
---|---|
Min. Order: | 1 Set |
Min. Order | FOB Price |
---|---|
1 Set | US$0.30-26.20 |
Port: | Qingdao, China |
---|---|
Production Capacity: | 3000 Ton/Year |
Payment Terms: | T/T |
Similar Items
Loading...
You May Like
Loading...
Product Description
Company Info
Address:
Yanjialing Village, Tongji Street Office, Jimo, Qingdao, Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Auto, Motorcycle Parts & Accessories, Industrial Equipment & Components, Manufacturing & Processing Machinery, Tools & Hardware
Management System Certification:
ISO 9001
Main Products:
Casting, Grating, Valve, Slats, Cast Iron, Wheels, Counterweight, Pump, Mechanical Component
Company Introduction:
Qingdao Hengtong Casting Co., Ltd, an industrial and trade integration, which manufacture and exporting various kinds of castings to more than 14 countries and 5 oceans especially USA, UK, Russia, AUSTRILIA, DUBAI etc., our main products are drain, grating, valve accessory, knife guard, adapter, building accessories, etc, used for building, bathroom accessory, drainage, machine, etc. We had more than 19 years foundry experience which established in 1996. No matter how big or small your requirement we will do our best to meet your demand.
Business Basic Process:
1. Client send drawing or sample for enquiry.
2. We make a quotation.
3. Client confirm the price.
4. Client pay mold cost.
5. We manufacture mold and supply sample. It will needs about 7-15 days.
6. Client confirm the sample.
7. Put order and pay at least 30% in advance.
8. Mass production.
9. Finish all products and take a picture, let client know.
10. Pay ballance.
11. Packing.
12. Delivery.
About the packing, we will always follow your requirement, such as carton, wooden box, pallet, etc.
The certifcates we have passed: ISO 9001 2008, UPC, SGS
Business Basic Process:
1. Client send drawing or sample for enquiry.
2. We make a quotation.
3. Client confirm the price.
4. Client pay mold cost.
5. We manufacture mold and supply sample. It will needs about 7-15 days.
6. Client confirm the sample.
7. Put order and pay at least 30% in advance.
8. Mass production.
9. Finish all products and take a picture, let client know.
10. Pay ballance.
11. Packing.
12. Delivery.
About the packing, we will always follow your requirement, such as carton, wooden box, pallet, etc.
The certifcates we have passed: ISO 9001 2008, UPC, SGS